Headline Savings:
Annual energy savings: | £ 10,500 |
Annual maintenance savings: | £ 4,000 |
Ten year savings: | £ 124,000 |
Payback period: | 1 ½ years |
Annual CO2 savings: | 57 tonnes |
Completion Date:
November, 2014
The Brief:
Veolia were seeking a low energy solution to their various facilities across UK. They were seeking a complete solution from survey of site, installation and post monitoring of energy savings. The product needed to be of excellent quality and with at least a 5 year warranty. Most of the existing mounting heights were over 10 meters.
The Solution:
Access to the lights was extremely restricted due to the position of recycling materials and plant. We needed a reliable solution as lamp changing was a costly exercise. Due to the mounting height and to avoid any re-wiring, a high powered product was required. We chose the LG Electronics high bay 180W. This proved more than a replacement for the existing 400W metal halide. The LG€™s inherent narrow beam angle of 68° pushed the light down to the floor even from 10 €“ 12 meters mounting heights.
interLED provided a complete service including installation, which was provided out of hours, over a single weekend to avoid any disruption to the plant.